From first sketch to final inspection.

Five stages, one contract, one team accountable for every one of them.

THE PROCESS

Five stages, start to finish.

01

Design

An initial consultation and site assessment, followed by design development that responds to the home's existing architecture — Spanish Colonial, Tudor, Mediterranean, or contemporary — and the owner's program.

Typically 2–4 weeks
02

Engineering

Structural and MEP engineering produces permit-ready drawings — moment frames, foundation work, panel upgrades — sized correctly the first time so plan check doesn't stall on redesign.

Typically 2–3 weeks
03

Permitting

Plan check and permit issuance managed directly with the relevant authority. Beverly Hills runs roughly a three-week plan-check cycle; for an ADU on a lot that already has a home, state law gives the city 60 days to decide a complete application; a Hancock Park project with exterior scope adds a Historic Preservation Overlay Zone (HPOZ) review — potentially a Certificate of Appropriateness — before permitting begins. Shulmen manages each directly rather than handing it to a third-party expediter.

Varies by city & scope — see the Permits Guide
04

Construction

Scheduled, sequenced construction with one point of contact — Ofir and the core team — so decisions don't wait on a chain of subcontractors and separate firms.

Typically 4 weeks – 14 months, by scope
05

Inspection

Final inspections are coordinated and closed out with the permitting authority before handoff — no open permits left behind.

Scheduled at project completion