From first sketch to final inspection.
Five stages, one contract, one team accountable for every one of them.
Five stages, start to finish.
Design
An initial consultation and site assessment, followed by design development that responds to the home's existing architecture — Spanish Colonial, Tudor, Mediterranean, or contemporary — and the owner's program.
Typically 2–4 weeksEngineering
Structural and MEP engineering produces permit-ready drawings — moment frames, foundation work, panel upgrades — sized correctly the first time so plan check doesn't stall on redesign.
Typically 2–3 weeksPermitting
Plan check and permit issuance managed directly with the relevant authority. Beverly Hills runs roughly a three-week plan-check cycle; for an ADU on a lot that already has a home, state law gives the city 60 days to decide a complete application; a Hancock Park project with exterior scope adds a Historic Preservation Overlay Zone (HPOZ) review — potentially a Certificate of Appropriateness — before permitting begins. Shulmen manages each directly rather than handing it to a third-party expediter.
Varies by city & scope — see the Permits GuideConstruction
Scheduled, sequenced construction with one point of contact — Ofir and the core team — so decisions don't wait on a chain of subcontractors and separate firms.
Typically 4 weeks – 14 months, by scopeInspection
Final inspections are coordinated and closed out with the permitting authority before handoff — no open permits left behind.
Scheduled at project completionTell us about your project.